Skip to content

City of Ava legal

Notice of Solicitation of bids for the City of Ava, Missouri Water Park Pool Repainting

Furnish and provide materials and labor to install epoxy pool paint to approximately 9000 sq. ft. previously painted concrete pool surface. Price shall include sandblasting, assorted crack repair and surface preparation suitable for epoxy paint. Bid submittals shall include proposed methods and materials used along with provided warranty specifications. Copy of insurance showing City of Ava as additional insured required, contact Kurt McGee 417-683-8052 for amounts or to set up site visit. Final product is to be white in color with black markings for swim lanes, line on safety ledge, steps and transitions and light blue along top. Steps shall have an anti-slip additive added to epoxy. All work to be performed in workmanlike manner, contractor is responsible for job related refuse removal. Prevailing wage applies. Bidders are encouraged to visit the jobsite prior to submittal. Work to be completed before March 31st 2015.

 

10-23-05-1t